PDF versionLenght of Roads on 31st December, 2006
| Kilometres | Miles | |
| National Primary Roads | 147.8 | 91.9 | 
| National Secondary Roads | 68.3 | 42.4 | 
| Regional | 315.9 | 196.3 | 
| Local Roads | 2,532.2 | 1,573.5 | 
| Total | 3,064.2 | 1,904.0 | 
note - same as 2007
Road Design / Construction / Improvement / Maintenance

The total expenditure on roads in the county was €119,451,985. An allocation of €11.552m was provided by the Department of the Environment, Heritage & Local Government whilst the National Road Authority allocated €103,695 towards National Roads. The Council allocated €2.615m from their own funds and €1.59m from Development Contributions.
The major schemes undertaken included:
- 
M8/N8 Cullahill/Cashel - Construction stage commenced. 
- 
N9/N10 1st Phase Waterford to Knocktopher - Phase 2 Contract. 
- 
N9 Phase 4-Knocktopher to Powerstown - Archaeological works carried out in 2006. 
- 
N77 Kilkenny Ring Road Extension - Construction commenced in June,2005 and works ongoing in 2006. 
- 
R700 Wallslough-Bennettsbridge - Construction completed in 2006. 
- 
N77 Bohernatounish Roundabout - Substantially completed in 2006. 
- 
N77 Ballynaslee - Design ongoing in 2006. 
- 
N76 Tennypark to Brownstown - Design ongoing in 2006. 
- 
Kilkenny Eastern Environs-Ballybough Street. Contract tender analysis underway in 2006. 
- 
Newpark Drive - Draft planning report completed. Revised Part 8 to be published early in 2007. 
- 
Kilkenny Inner Relief Road - Design ongoing and indicative route set out. 
- 
R705 Graiguenamanagh Relief Road - Contract underway and expected to be completed early in 2008. 
- 
N77 Bohernatounish Roundabout - Substantially completed in 2006. 
- 
N24 Piltown/Fiddown 2+1 Road - Completed in 2006. 
- 
N24 Mooncoin By Pass - Ground Investigation contract underway in 2006 

New footpath at the Watergate Theatre
Development Charges
Following the Council's adoption of a new Development Contribution Scheme in 2003 a sum of €3.975m allocated to roads. In accordance with the Council's Development Contributions Scheme 40% of the Roads budget is allocated at area level, while 60% is allocated at full Council level.
Community Involvement in the Road Works Scheme
| 2006 STATISTICS | |
| Total number of roads repaired | 14 | 
| Total length of roads repaired | 10.405 | 
| Total number of residents who benefited | 96 | 
| Total expenditure incurred | €726,099 | 
Local Improvement Schemes
This scheme refers to non-public roads serving two or more separate agricultural holdings . A local contribution of at least 10% of the cost of improvement works required and the balance is charged to the Local Improvement Scheme grant from DOELG.
| 2006 STATISTICS | |
| Total number of roads repaired | 11 | 
| Total length of roads repaired | 7.748 | 
| Total number of beneficiaries | 71 | 
| Total expenditure incurred | €624,108 | 
| Total value of local contributions | €99,893 | 
Public Lighting
Kilkenny County Council maintains over 6,000 lights.
Cost of electricity / maintenance / upgrade: €663,534.
In 1996 a decision was taken to upgrade all public lighting in the county from Mercury to sodium lights and a contract was entered into with the E.S.B. to upgrade same and provide infill lighting to be funded over a five year period. The works were completed in May 2000. In 2004 Kilkenny County Council agreed to a four year programme for public lighting which is ongoing.
Service Indicators
- Area of local and regional surfaced dressed 796,881 sqm.
- % local and regional surface dressed: 6.039 %